Fields / Martin Linge / 30/4-A-11
30/4-A-11
Development, productionProducingGas and condensate
Drilled by Equinor Energy AS with Maersk Intrepid in Martin Linge, 12.08.2021 to 04.01.2022 (145 days), to 4 800,0 m.
Water depth115,0 m
Total depth4 800,0 m MD
Vertical depth3 894,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,3 m
Formation at total depth-
RigMaersk Intrepid
Spud12.08.2021
Completed04.01.2022
OperatorEquinor Energy AS
Position60,5062 N, 2,0148 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Martin Linge gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 120 °C |
The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/4-A-12 | 0,0 | 4 980,0 | - | - | 2017 |
| 30/4-A-10 | 0,0 | 4 690,0 | - | - | 2014 |
| 30/4-A-18 | 0,0 | - | - | - | 2026 |
| 30/4-A-5 Y1 | 0,0 | 4 328,0 | - | - | 2025 |
| 30/4-A-5 Y2 | 0,0 | 4 594,0 | - | - | 2025 |
| 30/4-A-5 Y3 | 0,0 | 4 163,0 | - | - | 2025 |
| 30/4-A-19 | 0,0 | 5 276,0 | - | - | 2018 |
| 30/4-A-17 | 0,0 | 4 317,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.