Fields / Martin Linge / 30/4-A-17
30/4-A-17
Development, productionProducingGas and condensate
Drilled by Equinor Energy AS with Maersk Intrepid in Martin Linge, 30.03.2021 to 29.07.2021 (121 days), to 4 317,0 m.
Water depth115,0 m
Total depth4 317,0 m MD
Vertical depth4 132,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,3 m
Formation at total depth-
RigMaersk Intrepid
Spud30.03.2021
Completed29.07.2021
OperatorEquinor Energy AS
Position60,5062 N, 2,0148 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Martin Linge gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 128 °C |
The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.