WellplannerNorwegian shelf well data

Fields / Martin Linge / 30/4-A-9

30/4-A-9

Development, productionClosedGas

Drilled by Total E&P Norge AS with Maersk Intrepid in Martin Linge, 16.06.2016 to 09.10.2016 (115 days), to 4 605,0 m.

Water depth115,0 m
Total depth4 605,0 m MD
Vertical depth4 201,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,7 m
Formation at total depth-
RigMaersk Intrepid
Spud16.06.2016
Completed09.10.2016
OperatorTotal E&P Norge AS
Position60,5062 N, 2,0148 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Martin Linge gradient31,3 °C/km
Estimated at total depth from the gradient130 °C

The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/4-3 S0,04 605,0-2,062016
30/4-A-160,04 535,0--2021
30/4-A-100,04 690,0--2014
30/4-A-80,04 703,0--2014
30/4-A-170,04 317,0--2021
30/4-A-10,03 518,0--2014
30/4-A-30,02 055,0--2014
30/4-A-3 A0,02 831,0--2015

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗