Fields / Martin Linge / 30/4-A-3
30/4-A-3
Development, observationPluggedOil
Drilled by Total E&P Norge AS with Maersk Intrepid in Martin Linge, 23.09.2014 to 09.02.2015 (139 days), to 2 055,0 m.
Water depth115,0 m
Total depth2 055,0 m MD
Vertical depth1 826,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,7 m
Formation at total depth-
RigMaersk Intrepid
Spud23.09.2014
Completed09.02.2015
OperatorTotal E&P Norge AS
Position60,5062 N, 2,0149 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Martin Linge gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 56 °C |
The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/4-A-3 A same well | 0,0 | 2 831,0 | - | - | 2015 |
| 30/4-A-3 B same well | 0,0 | 3 470,0 | - | - | 2015 |
| 30/4-A-10 | 0,0 | 4 690,0 | - | - | 2014 |
| 30/4-A-11 | 0,0 | 4 800,0 | - | - | 2021 |
| 30/4-3 S | 0,0 | 4 605,0 | - | 2,06 | 2016 |
| 30/4-A-9 | 0,0 | 4 605,0 | - | - | 2016 |
| 30/4-A-5 Y1 | 0,0 | 4 328,0 | - | - | 2025 |
| 30/4-A-5 Y2 | 0,0 | 4 594,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.