Fields / Martin Linge / 30/4-A-8
30/4-A-8
Development, productionClosedGas
Drilled by Total E&P Norge AS with Maersk Intrepid in Martin Linge, 06.10.2014 to 10.04.2016 (552 days), to 4 703,0 m.
Water depth115,0 m
Total depth4 703,0 m MD
Vertical depth3 888,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,7 m
Formation at total depth-
RigMaersk Intrepid
Spud06.10.2014
Completed10.04.2016
OperatorTotal E&P Norge AS
Position60,5063 N, 2,0148 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Martin Linge gradient | 31,3 °C/km |
| Estimated at total depth from the gradient | 120 °C |
The gradient is the median of 7 released wells in Martin Linge with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.