30/6-28 S
Exploration, wildcatPlugged and abandonedOil
Drilled by Statoil Petroleum AS with COSLPioneer in Oseberg, 16.01.2012 to 29.03.2012 (73 days), to 4 064,0 m in the Hegre Group.
Water depth110,0 m
Total depth4 064,0 m MD
Vertical depth3 832,0 m TVD
Bottom-hole temperature140 °C
Max inclination31,0°
Rotary table25,0 m
Formation at total depthHegre Group
RigCOSLPioneer
Spud16.01.2012
Completed29.03.2012
OperatorStatoil Petroleum AS
Position60,5665 N, 2,7446 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 140 °C |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 145 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-U-26 | 0,0 | 749,0 | - | - | 2012 |
| 30/6-17 | 0,6 | 615,0 | - | 1,50 | 1985 |
| 30/6-17 A | 0,6 | 2 686,0 | 104 °C | 1,50 | 1986 |
| 30/6-17 R | 0,6 | 2 650,0 | 104 °C | 1,50 | 1985 |
| 30/6-H-6 Y1 | 2,1 | 4 570,0 | - | - | 2018 |
| 30/6-H-6 Y2 | 2,1 | 4 986,0 | - | - | 2019 |
| 30/6-H-5 Y1 | 2,1 | 5 894,0 | - | - | 2018 |
| 30/6-H-5 Y2 | 2,1 | 5 885,0 | - | - | 2019 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 198,5 | 36" | 202,0 | - |
| Surface casing | 20" | 1 003,0 | 26" | 1 010,0 | 1,54 LOT |
| Intermediate | 14" | 2 068,7 | 17 1/2" | 2 075,0 | 1,79 LOT |
| Intermediate | 9 5/8" | 3 382,0 | 12 1/4" | 3 402,0 | 1,78 LOT |
| Open hole | - | 4 063,0 | 8 1/2" | 4 063,0 | - |
Mud weight
18 measurements, one dot each, 1,20 to 1,68 g/cm³ against measured depth, obm-low ecd, obm-low ecd-hthp, versatec.