Fields / 30/6-U-26
30/6-U-26
Other, pilotPlugged and abandoned
Drilled by Statoil Petroleum AS with COSLPioneer, 14.01.2012 to 16.01.2012 (2 days), to 749,0 m.
Water depth110,0 m
Total depth749,0 m MD
Vertical depth749,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigCOSLPioneer
Spud14.01.2012
Completed16.01.2012
OperatorStatoil Petroleum AS
Position60,5663 N, 2,7446 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-28 S | 0,0 | 4 064,0 | 140 °C | 1,68 | 2012 |
| 30/6-17 | 0,6 | 615,0 | - | 1,50 | 1985 |
| 30/6-17 A | 0,6 | 2 686,0 | 104 °C | 1,50 | 1986 |
| 30/6-17 R | 0,6 | 2 650,0 | 104 °C | 1,50 | 1985 |
| 30/6-H-6 Y1 | 2,1 | 4 570,0 | - | - | 2018 |
| 30/6-H-6 Y2 | 2,1 | 4 986,0 | - | - | 2019 |
| 30/6-H-5 Y1 | 2,1 | 5 894,0 | - | - | 2018 |
| 30/6-H-5 Y2 | 2,1 | 5 885,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.