Fields / Oseberg / 30/6-C-14 A
30/6-C-14 A
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 18.07.2001 to 25.08.2001 (38 days), to 5 085,0 m.
Water depth108,0 m
Total depth5 085,0 m MD
Vertical depth2 688,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud18.07.2001
Completed25.08.2001
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7759 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 100 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-14 same well | 0,0 | 3 795,0 | - | - | 1992 |
| 30/6-C-14 B same well | 0,0 | 3 928,0 | - | - | 2013 |
| 30/6-C-10 | 0,0 | 3 380,0 | - | - | 1988 |
| 30/6-C-10 A | 0,0 | 3 433,0 | - | - | 1995 |
| 30/6-C-10 B | 0,0 | 5 180,0 | - | - | 1995 |
| 30/6-C-10 C | 0,0 | 5 256,0 | - | - | 1996 |
| 30/6-C-10 D | 0,0 | 4 485,0 | - | - | 2005 |
| 30/6-C-10 E | 0,0 | 6 020,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.