Fields / Oseberg / 30/6-C-16 A
30/6-C-16 A
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 03.07.1995 to 20.07.1995 (17 days), to 7 304,0 m.
Water depth108,0 m
Total depth7 304,0 m MD
Vertical depth2 723,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud03.07.1995
Completed20.07.1995
OperatorNorsk Hydro Produksjon AS
Position60,6081 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-16 same well | 0,0 | 6 056,0 | - | - | 1995 |
| 30/6-C-16 B same well | 0,0 | 8 103,0 | - | - | 2026 |
| 30/6-C-15 | 0,0 | 3 380,0 | - | - | 1992 |
| 30/6-C-15 A | 0,0 | 4 515,0 | - | - | 1992 |
| 30/6-C-15 B | 0,0 | 6 869,0 | - | - | 2002 |
| 30/6-C-15 C | 0,0 | 4 634,0 | - | - | 2007 |
| 30/6-C-15 D | 0,0 | 4 400,0 | - | - | 2015 |
| 30/6-C-12 | 0,0 | 4 106,0 | - | - | 1989 |
Casing and formation tests
No casing programme is reported for this wellbore.