WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-15 B

30/6-C-15 B

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 28.08.2002 to 19.11.2002 (83 days), to 6 869,0 m.

Water depth108,0 m
Total depth6 869,0 m MD
Vertical depth2 674,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud28.08.2002
Completed19.11.2002
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7759 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient100 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-15 same well0,03 380,0--1992
30/6-C-15 A same well0,04 515,0--1992
30/6-C-15 C same well0,04 634,0--2007
30/6-C-15 D same well0,04 400,0--2015
30/6-C-160,06 056,0--1995
30/6-C-16 A0,07 304,0--1995
30/6-C-16 B0,08 103,0--2026
30/6-C-110,02 770,0--1988

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗