30/6-C-11
Development, injectionInjectingGas
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Oseberg, 14.10.1988 to 06.12.1988 (53 days), to 2 770,0 m.
Water depth108,0 m
Total depth2 770,0 m MD
Vertical depth2 631,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean 8
Spud14.10.1988
Completed06.12.1988
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-C-7 | 0,0 | 3 100,0 | - | - | 1990 |
| 30/6-C-7 A | 0,0 | 3 610,0 | - | - | 1996 |
| 30/6-C-7 B | 0,0 | 5 175,0 | - | - | 1996 |
| 30/6-C-7 C | 0,0 | 6 093,0 | - | - | 1996 |
| 30/6-C-7 D | 0,0 | - | - | - | 2025 |
| 30/6-C-15 | 0,0 | 3 380,0 | - | - | 1992 |
| 30/6-C-15 A | 0,0 | 4 515,0 | - | - | 1992 |
| 30/6-C-15 B | 0,0 | 6 869,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.