WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-7 A

30/6-C-7 A

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 06.08.1996 to 30.08.1996 (24 days), to 3 610,0 m.

Water depth108,0 m
Total depth3 610,0 m MD
Vertical depth2 810,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud06.08.1996
Completed30.08.1996
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient105 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-7 same well0,03 100,0--1990
30/6-C-7 B same well0,05 175,0--1996
30/6-C-7 C same well0,06 093,0--1996
30/6-C-7 D same well0,0---2025
30/6-C-110,02 770,0--1988
30/6-29 S0,05 765,0-1,502015
30/6-C-80,04 124,0--1989
30/6-C-8 A0,03 920,0--2006

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗