30/6-C-8
Development, injectionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Oseberg, 15.08.1989 to 06.10.1989 (52 days), to 4 124,0 m.
Water depth108,0 m
Total depth4 124,0 m MD
Vertical depth2 833,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigTransocean 8
Spud15.08.1989
Completed06.10.1989
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-29 S | 0,0 | 5 765,0 | - | 1,50 | 2015 |
| 30/6-C-8 A same well | 0,0 | 3 920,0 | - | - | 2006 |
| 30/6-C-8 B same well | 0,0 | 3 796,0 | - | - | 2006 |
| 30/6-C-8 C same well | 0,0 | 5 767,0 | - | - | 2006 |
| 30/6-C-8 D same well | 0,0 | 5 765,0 | - | - | 2015 |
| 30/6-C-8 E same well | 0,0 | 4 629,0 | - | - | 2019 |
| 30/6-C-4 | 0,0 | 5 820,0 | - | - | 1992 |
| 30/6-C-4 A | 0,0 | 2 165,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.