30/6-C-8 C
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 12.04.2006 to 18.07.2006 (97 days), to 5 767,0 m.
Water depth108,0 m
Total depth5 767,0 m MD
Vertical depth2 706,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud12.04.2006
Completed18.07.2006
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7760 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-29 S | 0,0 | 5 765,0 | - | 1,50 | 2015 |
| 30/6-C-8 same well | 0,0 | 4 124,0 | - | - | 1989 |
| 30/6-C-8 A same well | 0,0 | 3 920,0 | - | - | 2006 |
| 30/6-C-8 B same well | 0,0 | 3 796,0 | - | - | 2006 |
| 30/6-C-8 D same well | 0,0 | 5 765,0 | - | - | 2015 |
| 30/6-C-8 E same well | 0,0 | 4 629,0 | - | - | 2019 |
| 30/6-C-4 | 0,0 | 5 820,0 | - | - | 1992 |
| 30/6-C-4 A | 0,0 | 2 165,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.