WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-21 A

30/6-C-21 A

Development, productionPluggedOil

Drilled by StatoilHydro Petroleum AS with Oseberg C in Oseberg, 28.11.2007 to 15.05.2008 (169 days), to 8 350,0 m.

Water depth108,6 m
Total depth8 350,0 m MD
Vertical depth2 914,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,3 m
Formation at total depth-
RigOseberg C
Spud28.11.2007
Completed15.05.2008
OperatorStatoilHydro Petroleum AS
Position60,6082 N, 2,7758 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient109 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-21 same well0,06 851,0--1993
30/6-C-21 B same well0,06 044,0--2019
30/6-C-220,04 300,0--1993
30/6-C-22 A0,0---2026
30/6-C-170,05 603,0--1994
30/6-C-17 A0,06 029,0--1994
30/6-C-17 B0,07 922,0--1994
30/6-C-17 C0,06 483,0--2001

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗