WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-22

30/6-C-22

Development, injectionClosedGas

Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 04.12.1993 to 11.01.1994 (38 days), to 4 300,0 m.

Water depth108,0 m
Total depth4 300,0 m MD
Vertical depth2 725,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud04.12.1993
Completed11.01.1994
OperatorNorsk Hydro Produksjon AS
Position60,6081 N, 2,7758 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient101 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-22 A same well0,0---2026
30/6-C-180,04 926,0--1993
30/6-C-18 A0,06 339,0--1993
30/6-C-18 B0,04 930,0--2018
30/6-C-210,06 851,0--1993
30/6-C-21 A0,08 350,0--2007
30/6-C-21 B0,06 044,0--2019
30/6-C-230,05 472,0--1994

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗