WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-25

30/6-C-25

Development, injectionInjectingGas

Drilled by Norsk Hydro Produksjon AS with Oseberg C in Oseberg, 25.03.1992 to 30.04.1992 (36 days), to 3 135,0 m.

Water depth108,0 m
Total depth3 135,0 m MD
Vertical depth2 696,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,0 m
Formation at total depth-
RigOseberg C
Spud25.03.1992
Completed30.04.1992
OperatorNorsk Hydro Produksjon AS
Position60,6081 N, 2,7758 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient100 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-260,07 530,0--1994
30/6-C-26 A0,09 327,0--1994
30/6-C-26 B0,07 330,0--2016
30/6-C-220,04 300,0--1993
30/6-C-22 A0,0---2026
30/6-C-230,05 472,0--1994
30/6-C-23 A0,05 134,0--2014
30/6-C-23 B0,05 185,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗