WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-27 AH

30/6-C-27 AH

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Oseberg, 07.05.1991 to 10.06.1991 (34 days), to 3 761,0 m.

Water depth108,0 m
Total depth3 761,0 m MD
Vertical depth2 710,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean 8
Spud07.05.1991
Completed10.06.1991
OperatorNorsk Hydro Produksjon AS
Position60,5410 N, 2,7193 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient102 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-27 H same well0,02 995,0--1991
30/6-U-271,11 029,0--2016
30/6-H-11,16 873,0--2019
30/6-H-21,13 566,0--2018
30/6-H-2 A1,14 093,0--2018
30/6-H-2 B1,13 269,0--2018
30/6-H-91,14 747,0--2018
30/6-H-9 A1,14 663,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗