Fields / 30/7-3
30/7-3
Exploration, wildcatPlugged and abandonedDry
Drilled by Norsk Hydro Produksjon AS with Polyglomar Driller, 06.08.1976 to 25.10.1976 (80 days), to 4 044,0 m in the Rødby Formation.
Water depth99,5 m
Total depth4 044,0 m MD
Vertical depth4 043,0 m TVD
Bottom-hole temperature119 °C
Max inclination2,8°
Rotary table24,0 m
Formation at total depthRødby Formation
RigPolyglomar Driller
Spud06.08.1976
Completed25.10.1976
OperatorNorsk Hydro Produksjon AS
Position60,2859 N, 2,2485 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 119 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/7-7 | 1,9 | 5 127,0 | 167 °C | 2,09 | 1978 |
| 30/10-7 | 12,6 | 2 612,0 | 75 °C | 1,32 | 1992 |
| 30/10-6 | 14,8 | 5 248,0 | 180 °C | 2,14 | 1992 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 159,0 | 36" | 173,0 | - |
| Surface casing | 20" | 694,0 | 26" | 700,0 | - |
| Intermediate | 13 3/8" | 2 642,0 | 17 1/2" | 2 652,0 | - |
| Intermediate | 9 5/8" | 3 782,0 | 12 1/4" | 3 789,0 | 2,31 LOT |
| Open hole | - | 4 044,0 | 8 3/8" | 4 044,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 2,11 g/cm³ against measured depth, seawater, spud mud.