Fields / Oseberg / 30/9-12
30/9-12
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Oseberg, 07.04.1991 to 09.05.1991 (32 days), to 2 994,0 m in the Cook Formation.
Water depth104,0 m
Total depth2 994,0 m MD
Vertical depth2 994,0 m TVD
Bottom-hole temperature118 °C
Max inclination3,4°
Rotary table25,0 m
Formation at total depthCook Formation
RigVildkat Explorer
Spud07.04.1991
Completed09.05.1991
OperatorNorsk Hydro Produksjon AS
Position60,4325 N, 2,8597 E
Formations
29 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 118 °C |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 113 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/9-12 A same well | 0,0 | 3 061,0 | 110 °C | 1,42 | 1991 |
| 30/9-12 AR same well | 0,0 | 3 065,0 | 101 °C | - | 2002 |
| 30/9-8 | 3,4 | 1 060,0 | - | 1,05 | 1989 |
| 30/9-8 R | 3,4 | 3 200,0 | 118 °C | - | 1989 |
| 30/9-2 | 4,2 | 2 830,0 | 107 °C | 1,16 | 1983 |
| 30/9-2 R | 4,2 | 2 830,0 | 107 °C | 1,25 | 1986 |
| 30/9-1 | 4,7 | 2 895,0 | 112 °C | 1,48 | 1982 |
| 30/9-6 | 5,6 | 3 034,0 | - | 1,40 | 1987 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 214,0 | 36" | 216,0 | - |
| Intermediate | 13 3/8" | 1 002,0 | 17 1/2" | 1 019,0 | 1,61 LOT |
| Intermediate | 9 5/8" | 2 528,0 | 12 1/4" | 2 545,0 | 1,69 LOT |
| Open hole | - | 2 994,0 | 8 1/2" | 2 994,0 | - |
Mud weight
32 measurements, one dot each, 1,00 to 1,42 g/cm³ against measured depth, water based.