Fields / Oseberg Sør / 30/9-8 R
30/9-8 R
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Oseberg Sør, 15.08.1989 to 25.09.1989 (41 days), to 3 200,0 m in the Drake Formation.
Water depth104,0 m
Total depth3 200,0 m MD
Vertical depth3 199,0 m TVD
Bottom-hole temperature118 °C
Max inclination3,3°
Rotary table23,0 m
Formation at total depthDrake Formation
RigPolar Pioneer
Spud15.08.1989
Completed25.09.1989
OperatorNorsk Hydro Produksjon AS
Position60,4239 N, 2,7995 E
Formations
37 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 118 °C |
| Drill-stem test at 2 913,4 m | 63 °C |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 116 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 215,0 | 36" | 215,0 | - |
| Intermediate | 13 3/8" | 1 044,0 | 17 1/2" | 1 060,0 | 1,67 LOT |
| Intermediate | 9 5/8" | 2 651,0 | 12 1/4" | 2 669,0 | 1,78 LOT |
| Liner | 7" | 3 198,0 | 8 1/2" | 3 200,0 | - |
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 3 | 2 825,0 - 2 848,0 | 12,7 | - | 27 | 405 | 28 667 |
| 2 | 2 837,0 - 2 848,0 | 25,4 | - | 15 | 35 | - |
| 1 | 2 904,4 - 2 913,4 | 19,5 | - | 63 | - | 1 100 |