Fields / Oseberg Sør / 30/9-7
30/9-7
Exploration, wildcatPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Oseberg Sør, 02.11.1988 to 23.12.1988 (51 days), to 3 565,0 m in the Nansen Formation.
Water depth98,0 m
Total depth3 565,0 m MD
Vertical depth3 563,0 m TVD
Bottom-hole temperature146 °C
Max inclination4,7°
Rotary table23,0 m
Formation at total depthNansen Formation
RigPolar Pioneer
Spud02.11.1988
Completed23.12.1988
OperatorNorsk Hydro Produksjon AS
Position60,4180 N, 2,7519 E
Formations
30 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 146 °C |
| Oseberg Sør gradient | 36,3 °C/km |
| Estimated at total depth from the gradient | 129 °C |
The gradient is the median of 16 released wells in Oseberg Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/9-28 S | 1,5 | 4 083,0 | 143 °C | 1,45 | 2016 |
| 30/9-8 | 2,7 | 1 060,0 | - | 1,05 | 1989 |
| 30/9-8 R | 2,7 | 3 200,0 | 118 °C | - | 1989 |
| 30/9-21 A | 3,3 | 4 086,0 | 132 °C | 1,49 | 2008 |
| 30/9-21 S | 3,3 | 4 090,0 | 132 °C | 1,52 | 2008 |
| 30/9-10 | 3,7 | 3 649,0 | 131 °C | 1,90 | 1990 |
| 30/9-F-1 | 4,0 | 7 584,0 | - | - | 2001 |
| 30/9-F-1 A | 4,0 | 7 935,0 | - | - | 2002 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 207,0 | 36" | 207,0 | - |
| Intermediate | 13 3/8" | 1 057,0 | 17 1/2" | 1 072,0 | 1,68 LOT |
| Intermediate | 9 5/8" | 2 756,0 | 12 1/4" | 2 770,0 | 1,50 LOT |
| Liner | 7" | 2 953,0 | 8 1/2" | 3 565,0 | - |
Mud weight
46 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 2 811,0 - 2 822,0 | 12,7 | - | - | 540 | 75 600 |