30/9-27 S
Exploration, appraisalPluggedOil
Drilled by Statoil Petroleum AS with Songa Delta in Oseberg, 20.08.2015 to 25.08.2015 (5 days), to 3 989,0 m in the Ness Formation.
Water depth103,0 m
Total depth3 989,0 m MD
Vertical depth3 353,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depthNess Formation
RigSonga Delta
Spud20.08.2015
Completed25.08.2015
OperatorStatoil Petroleum AS
Position60,4001 N, 2,6710 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-O-2 H | 0,0 | 4 263,0 | - | - | 2015 |
| 30/9-O-3 AH | 0,0 | 7 041,0 | - | - | 2022 |
| 30/9-O-3 H | 0,0 | 5 243,0 | - | - | 2021 |
| 30/9-O-1 AH | 0,0 | 5 881,0 | - | - | 2022 |
| 30/9-O-1 BH | 0,0 | 5 873,0 | - | - | 2022 |
| 30/9-O-1 H | 0,0 | 4 370,0 | - | - | 2015 |
| 30/9-O-4 H | 0,0 | 432,0 | - | - | 2014 |
| 30/9-U-4 | 0,0 | 573,0 | - | - | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 204,4 | 36" | 217,0 | - |
| Pilot hole | - | 555,0 | 9 7/8" | 555,0 | - |
| Surface casing | 20" | 1 164,2 | 26" | 1 178,0 | 1,65 FIT |
| Intermediate | 14" | 2 279,9 | 17 1/2" | 2 291,0 | 1,65 FIT |
| - | - | 2 294,0 | - | 2 294,0 | 1,60 FIT |
| Open hole | - | 3 989,0 | 8 1/2" | 3 989,0 | - |
Mud weight
9 measurements, one dot each, 1,30 to 1,60 g/cm³ against measured depth, innovert.