30/9-O-2 H
Development, injectionProducingGas
Drilled by Statoil Petroleum AS with Songa Delta in Oseberg, 17.02.2015 to 07.09.2015 (202 days), to 4 263,0 m.
Water depth103,0 m
Total depth4 263,0 m MD
Vertical depth3 274,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigSonga Delta
Spud17.02.2015
Completed07.09.2015
OperatorStatoil Petroleum AS
Position60,4001 N, 2,6710 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 124 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-27 S | 0,0 | 3 989,0 | - | 1,60 | 2015 |
| 30/9-O-3 AH | 0,0 | 7 041,0 | - | - | 2022 |
| 30/9-O-3 H | 0,0 | 5 243,0 | - | - | 2021 |
| 30/9-O-1 AH | 0,0 | 5 881,0 | - | - | 2022 |
| 30/9-O-1 BH | 0,0 | 5 873,0 | - | - | 2022 |
| 30/9-O-1 H | 0,0 | 4 370,0 | - | - | 2015 |
| 30/9-O-4 H | 0,0 | 432,0 | - | - | 2014 |
| 30/9-U-4 | 0,0 | 573,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.