30/9-B-1 C
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 27.02.2002 to 06.03.2002 (7 days), to 5 660,0 m.
Water depth109,0 m
Total depth5 660,0 m MD
Vertical depth2 766,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud27.02.2002
Completed06.03.2002
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8284 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-1 same well | 0,0 | 3 185,0 | - | - | 1992 |
| 30/9-B-1 A same well | 0,0 | 3 870,0 | - | - | 1992 |
| 30/9-B-1 B same well | 0,0 | 4 885,0 | - | - | 2002 |
| 30/9-B-1 D same well | 0,0 | 5 746,0 | - | - | 2016 |
| 30/9-B-2 | 0,0 | 4 247,0 | - | - | 1990 |
| 30/9-B-2 A | 0,0 | 4 422,0 | - | - | 2023 |
| 30/9-B-7 | 0,0 | 4 569,0 | - | - | 1988 |
| 30/9-B-7 A | 0,0 | 4 289,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.