30/9-B-2 A
Development, productionProducingGas
Drilled by Equinor Energy AS with Oseberg B in Oseberg, 03.02.2023 to 12.04.2023 (68 days), to 4 422,0 m.
Water depth109,0 m
Total depth4 422,0 m MD
Vertical depth2 484,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud03.02.2023
Completed12.04.2023
OperatorEquinor Energy AS
Position60,4934 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 92 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-2 same well | 0,0 | 4 247,0 | - | - | 1990 |
| 30/9-B-1 | 0,0 | 3 185,0 | - | - | 1992 |
| 30/9-B-1 A | 0,0 | 3 870,0 | - | - | 1992 |
| 30/9-B-1 B | 0,0 | 4 885,0 | - | - | 2002 |
| 30/9-B-1 C | 0,0 | 5 660,0 | - | - | 2002 |
| 30/9-B-1 D | 0,0 | 5 746,0 | - | - | 2016 |
| 30/9-B-3 | 0,0 | 2 983,0 | - | - | 1989 |
| 30/9-B-8 | 0,0 | 3 655,0 | - | - | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.