WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-8

30/9-B-8

Development, injectionClosedGas

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 04.02.1991 to 04.04.1991 (59 days), to 3 655,0 m.

Water depth109,0 m
Total depth3 655,0 m MD
Vertical depth2 764,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud04.02.1991
Completed04.04.1991
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8285 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient103 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-8 A same well0,0----
30/9-B-70,04 569,0--1988
30/9-B-7 A0,04 289,0--2003
30/9-B-7 B0,0----
30/9-B-140,04 223,0--1996
30/9-B-14 A0,05 796,0--1996
30/9-B-14 B0,08 912,0--2002
30/9-B-14 C0,06 632,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗