30/9-B-14
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 26.04.1996 to 18.05.1996 (22 days), to 4 223,0 m.
Water depth109,0 m
Total depth4 223,0 m MD
Vertical depth2 713,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud26.04.1996
Completed18.05.1996
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-14 A same well | 0,0 | 5 796,0 | - | - | 1996 |
| 30/9-B-14 B same well | 0,0 | 8 912,0 | - | - | 2002 |
| 30/9-B-14 C same well | 0,0 | 6 632,0 | - | - | 2017 |
| 30/9-B-14 D same well | 0,0 | 6 023,0 | - | - | 2017 |
| 30/9-B-14 E same well | 0,0 | 7 693,0 | - | - | 2018 |
| 30/9-B-13 | 0,0 | 3 492,0 | - | - | 1989 |
| 30/9-B-13 A | 0,0 | 7 666,0 | - | - | 1998 |
| 30/9-B-8 | 0,0 | 3 655,0 | - | - | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.