WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-13 A

30/9-B-13 A

Development, injectionInjectingWater and gas

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 25.11.1998 to 17.01.1999 (53 days), to 7 666,0 m.

Water depth109,0 m
Total depth7 666,0 m MD
Vertical depth2 380,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud25.11.1998
Completed17.01.1999
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8284 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient88 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-13 same well0,03 492,0--1989
30/9-B-190,04 090,0--1987
30/9-B-19 A0,06 656,0--2006
30/9-B-19 B0,07 301,0--2006
30/9-B-140,04 223,0--1996
30/9-B-14 A0,05 796,0--1996
30/9-B-14 B0,08 912,0--2002
30/9-B-14 C0,06 632,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗