WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-19

30/9-B-19

Development, injectionJunked

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 11.04.1987 to 15.08.1989 (857 days), to 4 090,0 m.

Water depth109,0 m
Total depth4 090,0 m MD
Vertical depth2 437,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud11.04.1987
Completed15.08.1989
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8285 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient91 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-19 A same well0,06 656,0--2006
30/9-B-19 B same well0,07 301,0--2006
30/9-B-130,03 492,0--1989
30/9-B-13 A0,07 666,0--1998
30/9-B-200,03 307,0--1986
30/9-B-20 A0,04 000,0--1997
30/9-B-250,03 920,0--1986
30/9-B-140,04 223,0--1996

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗