30/9-B-20
Development, injectionPluggedGas
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Oseberg, 09.07.1986 to 23.08.1986 (45 days), to 3 307,0 m.
Water depth109,0 m
Total depth3 307,0 m MD
Vertical depth2 634,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigVildkat Explorer
Spud09.07.1986
Completed23.08.1986
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-20 A same well | 0,0 | 4 000,0 | - | - | 1997 |
| 30/9-B-26 | 0,0 | 4 426,0 | - | - | 1986 |
| 30/9-B-26 A | 0,0 | 3 536,0 | - | - | 1997 |
| 30/9-B-26 B | 0,0 | 5 553,0 | - | - | 1997 |
| 30/9-B-26 C | 0,0 | 6 151,0 | - | - | 2008 |
| 30/9-B-19 | 0,0 | 4 090,0 | - | - | 1987 |
| 30/9-B-19 A | 0,0 | 6 656,0 | - | - | 2006 |
| 30/9-B-19 B | 0,0 | 7 301,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.