30/9-B-13
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 28.08.1989 to 27.10.1989 (60 days), to 3 492,0 m.
Water depth109,0 m
Total depth3 492,0 m MD
Vertical depth2 820,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud28.08.1989
Completed27.10.1989
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8284 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-13 A same well | 0,0 | 7 666,0 | - | - | 1998 |
| 30/9-B-19 | 0,0 | 4 090,0 | - | - | 1987 |
| 30/9-B-19 A | 0,0 | 6 656,0 | - | - | 2006 |
| 30/9-B-19 B | 0,0 | 7 301,0 | - | - | 2006 |
| 30/9-B-14 | 0,0 | 4 223,0 | - | - | 1996 |
| 30/9-B-14 A | 0,0 | 5 796,0 | - | - | 1996 |
| 30/9-B-14 B | 0,0 | 8 912,0 | - | - | 2002 |
| 30/9-B-14 C | 0,0 | 6 632,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.