WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-3

30/9-B-3

Development, injectionClosedGas

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 23.05.1989 to 30.06.1989 (38 days), to 2 983,0 m.

Water depth109,0 m
Total depth2 983,0 m MD
Vertical depth2 784,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud23.05.1989
Completed30.06.1989
OperatorNorsk Hydro Produksjon AS
Position60,4935 N, 2,8285 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient104 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-40,02 970,0--1992
30/9-B-4 A0,04 757,0--2004
30/9-B-4 AY20,04 790,0--2020
30/9-B-4 AY30,04 723,0--2020
30/9-B-20,04 247,0--1990
30/9-B-2 A0,04 422,0--2023
30/9-B-90,03 287,0--1993
30/9-B-9 A0,04 500,0--1993

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗