30/9-B-3
Development, injectionClosedGas
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 23.05.1989 to 30.06.1989 (38 days), to 2 983,0 m.
Water depth109,0 m
Total depth2 983,0 m MD
Vertical depth2 784,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud23.05.1989
Completed30.06.1989
OperatorNorsk Hydro Produksjon AS
Position60,4935 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 104 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-4 | 0,0 | 2 970,0 | - | - | 1992 |
| 30/9-B-4 A | 0,0 | 4 757,0 | - | - | 2004 |
| 30/9-B-4 AY2 | 0,0 | 4 790,0 | - | - | 2020 |
| 30/9-B-4 AY3 | 0,0 | 4 723,0 | - | - | 2020 |
| 30/9-B-2 | 0,0 | 4 247,0 | - | - | 1990 |
| 30/9-B-2 A | 0,0 | 4 422,0 | - | - | 2023 |
| 30/9-B-9 | 0,0 | 3 287,0 | - | - | 1993 |
| 30/9-B-9 A | 0,0 | 4 500,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.