30/9-B-4
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 14.07.1992 to 29.07.1992 (15 days), to 2 970,0 m.
Water depth109,0 m
Total depth2 970,0 m MD
Vertical depth2 854,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud14.07.1992
Completed29.07.1992
OperatorNorsk Hydro Produksjon AS
Position60,4935 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 107 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-4 A same well | 0,0 | 4 757,0 | - | - | 2004 |
| 30/9-B-4 AY2 same well | 0,0 | 4 790,0 | - | - | 2020 |
| 30/9-B-4 AY3 same well | 0,0 | 4 723,0 | - | - | 2020 |
| 30/9-B-3 | 0,0 | 2 983,0 | - | - | 1989 |
| 30/9-B-10 | 0,0 | 4 635,0 | - | - | 1996 |
| 30/9-B-10 A | 0,0 | 5 482,0 | - | - | 1996 |
| 30/9-B-10 BY1 | 0,0 | 6 936,0 | - | - | 2005 |
| 30/9-B-10 BY2 | 0,0 | 7 214,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.