WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-10

30/9-B-10

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 24.09.1996 to 28.10.1996 (34 days), to 4 635,0 m.

Water depth109,0 m
Total depth4 635,0 m MD
Vertical depth2 796,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud24.09.1996
Completed28.10.1996
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8286 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient104 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-10 A same well0,05 482,0--1996
30/9-B-10 BY1 same well0,06 936,0--2005
30/9-B-10 BY2 same well0,07 214,0--2005
30/9-B-10 C same well0,07 031,0--2021
30/9-B-40,02 970,0--1992
30/9-B-4 A0,04 757,0--2004
30/9-B-4 AY20,04 790,0--2020
30/9-B-4 AY30,04 723,0--2020

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗