WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-16

30/9-B-16

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 01.05.1995 to 05.06.1995 (35 days), to 3 240,0 m.

Water depth109,0 m
Total depth3 240,0 m MD
Vertical depth2 823,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud01.05.1995
Completed05.06.1995
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8286 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient105 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-16 A same well0,05 734,0--1996
30/9-B-16 B same well0,02 462,0--2005
30/9-B-150,04 400,0--1990
30/9-B-170,04 556,0--1993
30/9-B-100,04 635,0--1996
30/9-B-10 A0,05 482,0--1996
30/9-B-10 BY10,06 936,0--2005
30/9-B-10 BY20,07 214,0--2005

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗