Fields / Oseberg / 30/9-B-21 B
30/9-B-21 B
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 08.06.1998 to 20.06.1998 (12 days), to 5 219,0 m.
Water depth109,0 m
Total depth5 219,0 m MD
Vertical depth2 659,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud08.06.1998
Completed20.06.1998
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8285 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-21 same well | 0,0 | 3 314,0 | - | - | 1985 |
| 30/9-B-21 A same well | 0,0 | 3 775,0 | - | - | 1998 |
| 30/9-B-21 C same well | 0,0 | 5 875,0 | - | - | 2008 |
| 30/9-B-20 | 0,0 | 3 307,0 | - | - | 1986 |
| 30/9-B-20 A | 0,0 | 4 000,0 | - | - | 1997 |
| 30/9-B-27 | 0,0 | 3 463,0 | - | - | 1986 |
| 30/9-B-27 A | 0,0 | 3 512,0 | - | - | 1997 |
| 30/9-B-27 B | 0,0 | 6 075,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.