Fields / Oseberg / 30/9-B-23 A
30/9-B-23 A
Development, productionJunked
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 05.11.1999 to 02.12.1999 (27 days), to 5 201,0 m.
Water depth109,0 m
Total depth5 201,0 m MD
Vertical depth2 746,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud05.11.1999
Completed02.12.1999
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 102 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-23 same well | 0,0 | 4 266,0 | - | - | 1986 |
| 30/9-B-23 B same well | 0,0 | 5 984,0 | - | - | 2000 |
| 30/9-B-23 C same well | 0,0 | 6 228,0 | - | - | 2016 |
| 30/9-B-17 | 0,0 | 4 556,0 | - | - | 1993 |
| 30/9-B-24 | 0,0 | 3 538,0 | - | - | 1986 |
| 30/9-B-24 A | 0,0 | 5 800,0 | - | - | 1997 |
| 30/9-B-24 B | 0,0 | 5 050,0 | - | - | 2007 |
| 30/9-B-24 C | 0,0 | 5 818,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.