WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-23

30/9-B-23

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Oseberg, 29.08.1986 to 07.11.1986 (70 days), to 4 266,0 m.

Water depth109,0 m
Total depth4 266,0 m MD
Vertical depth2 729,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigVildkat Explorer
Spud29.08.1986
Completed07.11.1986
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8286 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient103 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-23 A same well0,05 201,0--1999
30/9-B-23 B same well0,05 984,0--2000
30/9-B-23 C same well0,06 228,0--2016
30/9-B-170,04 556,0--1993
30/9-B-240,03 538,0--1986
30/9-B-24 A0,05 800,0--1997
30/9-B-24 B0,05 050,0--2007
30/9-B-24 C0,05 818,0--2018

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗