Fields / Oseberg / 30/9-B-30 D
30/9-B-30 D
Development, productionPluggedOil
Drilled by Statoil Petroleum AS with Oseberg B in Oseberg, 10.11.2016 to 10.12.2016 (30 days), to 6 183,0 m.
Water depth109,0 m
Total depth6 183,0 m MD
Vertical depth2 737,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud10.11.2016
Completed10.12.2016
OperatorStatoil Petroleum AS
Position60,4934 N, 2,8287 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 102 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-30 same well | 0,0 | 7 623,0 | - | - | 1993 |
| 30/9-B-30 A same well | 0,0 | 5 724,0 | - | - | 1998 |
| 30/9-B-30 B same well | 0,0 | 6 479,0 | - | - | 1998 |
| 30/9-B-30 C same well | 0,0 | 6 531,0 | - | - | 2008 |
| 30/9-B-30 E same well | 0,0 | 4 692,0 | - | - | 2020 |
| 30/9-B-24 | 0,0 | 3 538,0 | - | - | 1986 |
| 30/9-B-24 A | 0,0 | 5 800,0 | - | - | 1997 |
| 30/9-B-24 B | 0,0 | 5 050,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.