30/9-B-30

Development, injectionJunked

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 03.12.1993 to 16.09.1994 (287 days), to 7 623,0 m.

Water depth109,0 m
Total depth7 623,0 m MD
Vertical depth2 764,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud03.12.1993
Completed16.09.1994
OperatorNorsk Hydro Produksjon AS
Position60,4934 N, 2,8287 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient103 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-30 A same well0,05 724,0--1998
30/9-B-30 B same well0,06 479,0--1998
30/9-B-30 C same well0,06 531,0--2008
30/9-B-30 D same well0,06 183,0--2016
30/9-B-30 E same well0,04 692,0--2020
30/9-B-240,03 538,0--1986
30/9-B-24 A0,05 800,0--1997
30/9-B-24 B0,05 050,0--2007