Fields / Oseberg / 30/9-B-34 A
30/9-B-34 A
Development, injectionInjectingWater
Drilled by Equinor Energy AS with Oseberg B in Oseberg, 12.07.2022 to 23.12.2022 (164 days), to 2 518,0 m.
Water depth109,0 m
Total depth2 518,0 m MD
Vertical depth82,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud12.07.2022
Completed23.12.2022
OperatorEquinor Energy AS
Position60,4933 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 4 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-34 same well | 0,0 | 8 080,0 | - | - | 1994 |
| 30/9-B-40 | 0,0 | 4 833,0 | - | - | 1990 |
| 30/9-B-40 A | 0,0 | 5 281,0 | - | - | 2000 |
| 30/9-B-40 B | 0,0 | 6 038,0 | - | - | 2001 |
| 30/9-B-40 C | 0,0 | 4 672,0 | - | - | 2023 |
| 30/9-B-35 | 0,0 | 6 770,0 | - | - | 1993 |
| 30/9-B-35 A | 0,0 | 6 853,0 | - | - | 2018 |
| 30/9-B-35 B | 0,0 | 7 146,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.