Fields / Oseberg / 30/9-B-40 A
30/9-B-40 A
Development, productionJunked
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 26.09.2000 to 02.12.2000 (67 days), to 5 281,0 m.
Water depth109,0 m
Total depth5 281,0 m MD
Vertical depth2 433,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud26.09.2000
Completed02.12.2000
OperatorNorsk Hydro Produksjon AS
Position60,4933 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 90 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-40 same well | 0,0 | 4 833,0 | - | - | 1990 |
| 30/9-B-40 B same well | 0,0 | 6 038,0 | - | - | 2001 |
| 30/9-B-40 C same well | 0,0 | 4 672,0 | - | - | 2023 |
| 30/9-B-34 | 0,0 | 8 080,0 | - | - | 1994 |
| 30/9-B-34 A | 0,0 | 2 518,0 | - | - | 2022 |
| 30/9-B-39 | 0,0 | 5 745,0 | - | - | 1991 |
| 30/9-B-39 AY1 | 0,0 | 7 184,0 | - | - | 2020 |
| 30/9-B-39 AY2 | 0,0 | 7 132,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.