Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 27.04.1991 to 26.09.1991 (152 days), to 5 745,0 m.
Water depth109,0 m
Total depth5 745,0 m MD
Vertical depth2 840,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud27.04.1991
Completed26.09.1991
OperatorNorsk Hydro Produksjon AS
Position60,4933 N, 2,8286 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 106 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-39 AY1 same well | 0,0 | 7 184,0 | - | - | 2020 |
| 30/9-B-39 AY2 same well | 0,0 | 7 132,0 | - | - | 2021 |
| 30/9-B-40 | 0,0 | 4 833,0 | - | - | 1990 |
| 30/9-B-40 A | 0,0 | 5 281,0 | - | - | 2000 |
| 30/9-B-40 B | 0,0 | 6 038,0 | - | - | 2001 |
| 30/9-B-40 C | 0,0 | 4 672,0 | - | - | 2023 |
| 30/9-B-38 | 0,0 | 5 027,0 | - | - | 1992 |
| 30/9-B-38 A | 0,0 | 5 831,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.