WellplannerNorwegian shelf well data

Fields / Oseberg / 30/9-B-42 A

30/9-B-42 A

Development, injectionPluggedCuttings

Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 27.07.2001 to 02.08.2001 (6 days), to 1 142,0 m.

Water depth109,0 m
Total depth1 142,0 m MD
Vertical depth1 127,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud27.07.2001
Completed02.08.2001
OperatorNorsk Hydro Produksjon AS
Position60,4933 N, 2,8287 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient41 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/9-B-42 same well0,03 281,0--1988
30/9-B-42 B same well0,01 923,0--2022
30/9-B-410,04 089,0--1998
30/9-B-41 A0,06 665,0--1998
30/9-B-41 B0,06 563,0--2015
30/9-B-480,07 265,0--1993
30/9-B-48 A0,02 834,0--2024
30/9-B-360,04 037,0--1996

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗