30/9-B-42
Development, productionJunked
Drilled by Norsk Hydro Produksjon AS with Oseberg B in Oseberg, 06.08.1988 to 29.04.1989 (266 days), to 3 281,0 m.
Water depth109,0 m
Total depth3 281,0 m MD
Vertical depth2 069,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigOseberg B
Spud06.08.1988
Completed29.04.1989
OperatorNorsk Hydro Produksjon AS
Position60,4933 N, 2,8287 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/9-B-42 A same well | 0,0 | 1 142,0 | - | - | 2001 |
| 30/9-B-42 B same well | 0,0 | 1 923,0 | - | - | 2022 |
| 30/9-B-41 | 0,0 | 4 089,0 | - | - | 1998 |
| 30/9-B-41 A | 0,0 | 6 665,0 | - | - | 1998 |
| 30/9-B-41 B | 0,0 | 6 563,0 | - | - | 2015 |
| 30/9-B-48 | 0,0 | 7 265,0 | - | - | 1993 |
| 30/9-B-48 A | 0,0 | 2 834,0 | - | - | 2024 |
| 30/9-B-36 | 0,0 | 4 037,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.