31/2-4
Exploration, appraisalSuspendedDry
Drilled by A/S Norske Shell with Borgny Dolphin in Troll, 01.09.1980 to 13.09.1980 (12 days), to 815,0 m in the Hordaland Group.
Water depth336,0 m
Total depth815,0 m MD
Vertical depth815,0 m TVD
Bottom-hole temperature-
Max inclination0,5°
Rotary table25,0 m
Formation at total depthHordaland Group
RigBorgny Dolphin
Spud01.09.1980
Completed13.09.1980
OperatorA/S Norske Shell
Position60,8565 N, 3,5123 E
Formations
4 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 21 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-4 R same well | 0,0 | 5 035,0 | 141 °C | 1,62 | 1980 |
| 31/2-4 R2 same well | 0,0 | 5 035,0 | 141 °C | - | 1982 |
| 31/2-D-10 H | 1,4 | 1 723,0 | - | - | 1997 |
| 31/2-W-23 H | 2,0 | 1 765,0 | - | - | 2019 |
| 31/2-W-24 H | 2,0 | 1 577,0 | - | - | 2019 |
| 31/2-W-22 H | 2,0 | 1 593,0 | - | - | 2019 |
| 31/2-W-21 H | 2,0 | 1 604,0 | - | - | 2019 |
| 31/2-12 | 2,4 | 1 615,0 | 71 °C | 1,31 | 1983 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 420,0 | 36" | 425,0 | - |
| Conductor | 30" | 446,0 | 36" | 450,0 | - |
| Surface casing | 20" | 782,0 | 26" | 790,0 | - |
| Surface casing | 20" | 807,0 | 26" | 815,0 | 1,71 LOT |
Mud weight
2 measurements, one dot each, 1,00 to 1,28 g/cm³ against measured depth, seawater.