31/2-D-10 H
Development, productionPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 09.10.1997 to 28.10.1997 (19 days), to 1 723,0 m.
Water depth337,0 m
Total depth1 723,0 m MD
Vertical depth1 720,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud09.10.1997
Completed28.10.1997
OperatorNorsk Hydro Produksjon AS
Position60,8531 N, 3,4877 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 55 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-4 | 1,4 | 815,0 | - | 1,28 | 1980 |
| 31/2-4 R | 1,4 | 5 035,0 | 141 °C | 1,62 | 1980 |
| 31/2-4 R2 | 1,4 | 5 035,0 | 141 °C | - | 1982 |
| 31/2-7 | 2,0 | 1 660,0 | 71 °C | 1,31 | 1982 |
| 31/2-D-4 Y1H | 2,1 | 6 510,0 | - | - | 2003 |
| 31/2-D-4 Y2H | 2,1 | 5 278,0 | - | - | 2003 |
| 31/2-W-23 H | 2,2 | 1 765,0 | - | - | 2019 |
| 31/2-W-22 H | 2,2 | 1 593,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.