Fields / Troll / 31/2-D-6 BY1H
31/2-D-6 BY1H
Development, productionProducingOil
Drilled by Equinor Energy AS with Transocean Endurance in Troll, 05.02.2023 to 23.02.2023 (18 days), to 4 442,0 m.
Water depth337,4 m
Total depth4 442,0 m MD
Vertical depth1 600,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigTransocean Endurance
Spud05.02.2023
Completed23.02.2023
OperatorEquinor Energy AS
Position60,8566 N, 3,4414 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-D-6 AY1H same well | 0,0 | 6 923,0 | - | - | 2012 |
| 31/2-D-6 AY2H same well | 0,0 | 4 714,0 | - | - | 2013 |
| 31/2-D-6 AY3H same well | 0,0 | 5 648,0 | - | - | 2013 |
| 31/2-D-6 BY2H same well | 0,0 | 8 500,0 | - | - | 2023 |
| 31/2-D-6 BY3H same well | 0,0 | 10 200,0 | - | - | 2023 |
| 31/2-D-6 H same well | 0,0 | 3 685,0 | - | - | 1994 |
| 31/2-D-5 AH | 0,1 | 3 800,0 | - | - | 1997 |
| 31/2-D-5 BY1H | 0,1 | 4 933,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.