WellplannerNorwegian shelf well data

Fields / Troll / 31/2-D-6 H

31/2-D-6 H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 26.10.1994 to 22.11.1994 (27 days), to 3 685,0 m.

Water depth337,4 m
Total depth3 685,0 m MD
Vertical depth1 586,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud26.10.1994
Completed22.11.1994
OperatorNorsk Hydro Produksjon AS
Position60,8566 N, 3,4414 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-D-6 AY1H same well0,06 923,0--2012
31/2-D-6 AY2H same well0,04 714,0--2013
31/2-D-6 AY3H same well0,05 648,0--2013
31/2-D-6 BY1H same well0,04 442,0--2023
31/2-D-6 BY2H same well0,08 500,0--2023
31/2-D-6 BY3H same well0,010 200,0--2023
31/2-D-5 AH0,13 800,0--1997
31/2-D-5 BY1H0,14 933,0--2015

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗